Dayton · GDPM-adjacent · Landlords

Dayton landlord prep checklist — before HQS or NSPIRE day.

If you rent to voucher / assisted tenants in the Dayton area, inspection day is about access, utilities, and fixing what the standard actually cares about. This page is a plain-English prep list for landlords and property managers — not Greater Dayton Premier Management’s (GDPM) official rulebook.

Small white single-family house with a mowed lawn and mature trees.
  • HQS → clear pass or fail (Form HUD-52580 / 52580-A when required)
  • NSPIRE → findings by defect severity, documented from the visit
Read first
  1. GDPM sets the official calendar and program outcome. A readiness / mock walk from ATK is not the official GDPM inspection and does not guarantee a pass, a score, or program approval.
  2. Confirm current GDPM / PHA repair windows for life-threatening vs non–life-threatening items. Timelines are program-specific — this page is not GDPM policy.
  3. Prep for the standard your notice uses — HQS, NSPIRE, or a readiness walk before the official date.
  4. Contact: email info@atkinspections.com.

Before anyone walks the unit

Access

  • Adult with keys on site (or lockbox + code shared)
  • All rooms unlocked: basement, attic access, garage, outbuildings if part of the unit
  • Pets secured

Utilities & habitability basics

  • Electric on
  • Gas on (if equipped)
  • Water on; water heater working
  • Heat available in season

Paperwork / booking

  • Know whether this visit is HQS, NSPIRE, or a readiness walk
  • Unit address, bedroom count, and who to call if something is locked
  • Prior inspection notes pulled (if this is a re-check)

After the inspection: what to fix first

If this is an HQS inspection

HQS ends in a pass or fail. A fail is not the end of the job — it is a list of what to fix.

  1. Get the fail reasons in writing (what failed, where).
  2. Sort life-threatening vs other items (see below).
  3. Fix within the window your PHA / GDPM program requires — confirm current deadlines with them.
  4. Request re-inspection when repairs are done.
  5. When required, Form HUD-52580 / 52580-A records what was observed on site. The HCV program outcome remains the PHA’s call.

If this is an NSPIRE inspection

NSPIRE findings are organized by defect severity.

  1. Get the findings (what was observed, and severity where noted).
  2. Prioritize life-threatening defects first, then non–life-threatening items.
  3. Repair against the findings and your program’s rules.
  4. Follow up if the PHA / program requires a re-walk after deficiencies are found.
  5. The PHA or program applies its own rules to those results. ATK documents the visit.

Life-threatening vs non–life-threatening

Use these categories so crews fix the right things first. Exact GDPM deadlines are theirs to publish — ask GDPM or your program for current repair windows.

Treat as life-threatening urgency (examples — not a complete code list)

  • No working smoke / CO protection where required
  • Gas leak smell or unsafe combustion
  • Exposed live electrical hazards
  • No working heat when required for weather / program rules
  • Blocked egress (can’t get out in a fire)
  • Sewage backup or major sanitary hazard in the living space

Landlord action: make it safe now, then confirm GDPM’s required notice and repair timeline.

Treat as non–life-threatening (still must fix — examples)

  • Damaged but non-critical surfaces, hardware, screens
  • Minor plumbing drips without a sewage hazard
  • Missing or damaged weatherization that is not an immediate life-safety issue
  • Deferred maintenance called out on the report

Landlord action: schedule repairs inside your program’s window; keep receipts and photos if your PHA asks.

NSPIRE note: severity levels (including life-threatening vs non–life-threatening) are part of NSPIRE findings.

Room-by-room quick scan

A landlord walk to catch obvious issues before the official day — not a substitute for the HQS or NSPIRE protocol.

Exterior / entry

  • Address visible
  • Steps and rails secure
  • No major trip hazards on the approach

Kitchen

  • Sink works; no active leaks
  • Stove / oven operates (if provided)
  • GFCI protection where required

Bath

  • Toilet, sink, tub / shower work
  • Fan or openable window for ventilation where expected
  • No active leaks or soft floors

Bedrooms / living

  • Outlets and lights work
  • Windows open and lock as designed
  • Smoke alarms present and working

Mechanical / utility

  • Water heater area clear and dry
  • Furnace area accessible; filter not clogged
  • Electrical panel cover on; no open splices

Safety

  • Egress paths clear
  • Handrails where stairs need them
  • No obvious hazards along the inspector’s path

A mock walk is not the official GDPM inspection

ATK readiness / mock walkOfficial GDPM / PHA inspection
Who decides the program outcomeDoes notGDPM / PHA
PurposeSurface likely issues; set fix orderOfficial HQS or NSPIRE results, under their rules
GuaranteeNoneATK cannot promise their result
PaperworkReadiness notesTheir forms and calendar

Plainly: a prep walk helps you fix things before the official date. It is not a GDPM stamp, not HUD approval, and not a guaranteed HQS pass or NSPIRE score.

What ATK can do in Dayton

  • HQS on-site inspections (pass/fail · HUD-52580 when required)
  • NSPIRE inspections, protocol support, and readiness consulting
  • Familiar with Yardi and Emphasys when those systems are part of your workflow
  • Southwest Ohio coverage including Dayton — travel for larger jobs when the schedule allows

Credentials listed separately: Ohio home inspector OHI.2019006734.

Short FAQ

Is this GDPM’s official checklist?

No. It is ATK’s landlord prep guide for Dayton-area HQS and NSPIRE work. Confirm current GDPM rules with GDPM.

Do you guarantee we’ll pass with GDPM?

No. ATK documents what is observed on the visit — HQS or NSPIRE inspection findings. Program outcomes stay with GDPM or your PHA.

HQS or NSPIRE — which do I prep for?

Prep for the standard on your notice or engagement. When unsure, email ATK with what GDPM or your program scheduled.

How do I book?

Email info@atkinspections.com or call (937) 553-0388 with the city, unit count, and HQS / NSPIRE / readiness consulting.

Dayton HQS & NSPIRE · HUD-52580 · HQS vs NSPIRE · Readiness consulting · FAQ

Email before the official date with: Dayton-area city · unit count · HQS / NSPIRE / readiness · official date if known.