Dayton · GDPM-adjacent · Landlords

Dayton landlord prep checklist — before HQS or NSPIRE day.

If you rent to voucher / assisted tenants in the Dayton area, inspection day is about access, utilities, and fixing what the standard actually cares about. This page is a plain-English prep list for landlords and property managers — not Greater Dayton Premier Management’s (GDPM) official rulebook.

  • HQS → clear pass or fail (Form HUD-52580 / 52580-A when required)
  • NSPIRE → scored / graded findings by defect severity — not pass/fail
Read first
  1. GDPM sets the official calendar and program outcome. A readiness / mock walk from ATK is not the official GDPM inspection and does not guarantee a pass, a score, or program approval.
  2. Confirm current GDPM / PHA repair windows for life-threatening vs non–life-threatening items. Timelines are program-specific — this page is not GDPM policy.
  3. Prep for the standard your notice uses — HQS, NSPIRE, or a readiness walk before the official date.
  4. Contact: email [email protected].

Before anyone walks the unit

Access

  • Adult with keys on site (or lockbox + code shared)
  • All rooms unlocked: basement, attic access, garage, outbuildings if part of the unit
  • Pets secured

Utilities & habitability basics

  • Electric on
  • Gas on (if equipped)
  • Water on; water heater working
  • Heat available in season

Paperwork / booking

  • Know whether this visit is HQS, NSPIRE, or a readiness walk
  • Unit address, bedroom count, and who to call if something is locked
  • Prior inspection notes pulled (if this is a re-check)

After the inspection: what to fix first

If this is an HQS inspection

HQS ends in a pass or fail. A fail is not the end of the job — it is a list of what to fix.

  1. Get the fail reasons in writing (what failed, where).
  2. Sort life-threatening vs other items (see below).
  3. Fix within the window your PHA / GDPM program requires — confirm current deadlines with them.
  4. Request re-inspection when repairs are done.
  5. When required, Form HUD-52580 / 52580-A records what was observed on site. The HCV program outcome remains the PHA’s call.

If this is an NSPIRE inspection

NSPIRE is a scored / graded standard by defect severity — it does not end in a pass/fail label.

  1. Get the scored / graded findings (what was observed, and severity where noted).
  2. Prioritize life-threatening defects first, then non–life-threatening items.
  3. Repair against the findings and your program’s rules.
  4. Follow up if the PHA / program requires a re-walk after scored deficiencies.
  5. The PHA or program applies its own rules to those results. ATK documents the visit.

Life-threatening vs non–life-threatening

Use these categories so crews fix the right things first. Exact GDPM deadlines are theirs to publish — ask GDPM or your program for current repair windows.

Treat as life-threatening urgency (examples — not a complete code list)

  • No working smoke / CO protection where required
  • Gas leak smell or unsafe combustion
  • Exposed live electrical hazards
  • No working heat when required for weather / program rules
  • Blocked egress (can’t get out in a fire)
  • Sewage backup or major sanitary hazard in the living space

Landlord action: make it safe now, then confirm GDPM’s required notice and repair timeline.

Treat as non–life-threatening (still must fix — examples)

  • Damaged but non-critical surfaces, hardware, screens
  • Minor plumbing drips without a sewage hazard
  • Missing or damaged weatherization that is not an immediate life-safety issue
  • Deferred maintenance called out on the report

Landlord action: schedule repairs inside your program’s window; keep receipts and photos if your PHA asks.

NSPIRE note: severity levels (including life-threatening vs non–life-threatening) feed NSPIRE scoring / grading — they are not a pass/fail result.

Room-by-room quick scan

A landlord walk to catch obvious issues before the official day — not a substitute for the HQS or NSPIRE protocol.

Exterior / entry

  • Address visible
  • Steps and rails secure
  • No major trip hazards on the approach

Kitchen

  • Sink works; no active leaks
  • Stove / oven operates (if provided)
  • GFCI protection where required

Bath

  • Toilet, sink, tub / shower work
  • Fan or openable window for ventilation where expected
  • No active leaks or soft floors

Bedrooms / living

  • Outlets and lights work
  • Windows open and lock as designed
  • Smoke alarms present and working

Mechanical / utility

  • Water heater area clear and dry
  • Furnace area accessible; filter not clogged
  • Electrical panel cover on; no open splices

Safety

  • Egress paths clear
  • Handrails where stairs need them
  • No obvious hazards along the inspector’s path

A mock walk is not the official GDPM inspection

ATK readiness / mock walkOfficial GDPM / PHA inspection
Who decides the program outcomeDoes notGDPM / PHA
PurposeSurface likely issues; set fix orderOfficial HQS pass/fail, or NSPIRE scored / graded results, under their rules
GuaranteeNoneATK cannot promise their result
PaperworkReadiness notesTheir forms and calendar

Plainly: a prep walk helps you fix things before the official date. It is not a GDPM stamp, not HUD approval, and not a guaranteed HQS pass or NSPIRE score.

What ATK can do in Dayton

  • HQS certified on-site inspections (pass/fail · HUD-52580 when required)
  • NSPIRE inspections, protocol support, and readiness consulting (trained on NSPIRE · scored / graded findings)
  • Familiar with Yardi and Emphasys when those systems are part of your workflow
  • Southwest Ohio coverage including Dayton — travel for larger jobs when the schedule allows

Credentials listed separately: HQS certified · Ohio home inspector OHI.2019006734 · trained on NSPIRE (not “NSPIRE certified”).

Short FAQ

Is this GDPM’s official checklist?

No. It is ATK’s landlord prep guide for Dayton-area HQS and NSPIRE work. Confirm current GDPM rules with GDPM.

Do you guarantee we’ll pass with GDPM?

No. ATK documents what is observed on the visit — HQS pass/fail, or NSPIRE scored / graded findings. Program outcomes stay with GDPM or your PHA.

HQS or NSPIRE — which do I prep for?

Prep for the standard on your notice or engagement. When unsure, email ATK with what GDPM or your program scheduled.

How do I book?

Email [email protected] with the city, unit count, and HQS / NSPIRE / readiness consulting. No public phone.

Dayton HQS & NSPIRE · HUD-52580 · HQS vs NSPIRE · Readiness consulting · FAQ

Email before the official date with: Dayton-area city · unit count · HQS / NSPIRE / readiness · official date if known.