Dayton landlord inspection prep checklist (GDPM voucher units)

ATK Inspections · Check each box the week before inspection day. GDPM voucher inspections use HQS today (pass/fail). HUD's NSPIRE standard, required for all voucher programs by Feb 1, 2027, rates each problem by severity and sets a repair deadline for it. Fixing these items covers both.

Before the inspector arrives

Fire and life safety

Electrical

Kitchen

Bathroom and plumbing

Heat

Doors, windows, stairs, floors

Paint, pests, outside

Process at GDPM today: the inspection happens within 15 days of the RFTA. If the unit fails, you fix the items and call the inspector to schedule the re-inspection. Life-threatening items must be fixed within 24 hours. This is ATK's prep guide, not GDPM's or HUD's official checklist. GDPM decides the outcome and the deadlines, and a prep walk doesn't guarantee a pass. Not legal advice.
ATK Inspections (ATK Enterprises, a fictitious name / DBA). HQS inspections · trained on NSPIRE · Ohio HI OHI.2019006734 (state license only — not HUD/NSPIRE authority). Not affiliated with GDPM or HUD.

Want a prep walk before GDPM shows up? Email [email protected] with the address, number of units, and inspection date.