1. Smoke alarms

Missing, dead, or painted-over alarms. Each level needs a working alarm; many Ohio programs (including Dayton-area PHAs) now ask for hardwired or 10-year sealed-battery alarms in and outside each sleeping area. Test every one and check the date stamp.

2. Carbon monoxide

Units with fuel-burning appliances or an attached garage are expected to have CO alarms under current HUD rules. Add them near sleeping areas.

3. Electrical hazards

Missing outlet or switch cover plates, exposed or spliced wiring, open junction boxes, ungrounded three-prong outlets, no GFCI near sinks, and dead outlets. A $1 cover plate is one of the most common reasons a unit fails.

4. Windows

Cracked or broken panes, windows that won't stay open, missing locks on accessible windows, painted-shut sleeping-room windows needed for egress, and torn or missing screens where the program requires them.

5. Doors and security

Exterior doors that don't lock, gaps you can see daylight through, damaged frames, and double-keyed deadbolts that block a fire exit.

6. Water heater

Missing temperature/pressure relief valve or a discharge line that is too short or capped, missing seismic strap where required, gas venting problems, and combustibles stored nearby.

7. Heating

No working permanent heat source, a furnace that won't fire during the inspection, missing filters or covers, and rooms with no heat supply.

8. Plumbing

Active leaks, slow or clogged drains, a toilet that rocks or runs, no hot water at a fixture, and missing P-traps.

9. Stairs, rails, and porches

Missing handrails on four or more steps, loose railings, missing guardrails on porches or decks above about 30 inches, and broken treads.

10. Peeling paint (pre-1978 homes)

Deteriorated paint in a pre-1978 unit where a child under six will live triggers lead-safe requirements. Scraping it yourself the morning of the inspection usually makes it worse; it needs lead-safe work practices.

11. Pests and sanitation

Roaches, mice, bedbugs, heavy trash or debris, and no working range or refrigerator if the owner is supplying them.

12. Interior surfaces

Holes in walls or ceilings, water-stained or sagging ceilings, trip-hazard flooring, and mold-like growth.

What happens after a failed HQS inspection?

The housing authority sends a list of deficiencies and a deadline. You make the repairs and contact the PHA to schedule a re-inspection. For an initial (move-in) inspection the unit has to pass before the lease and HAP contract can start, so every failed item delays your first payment. For units already under contract, missing the repair deadline can lead to abatement of payments. Exact timelines are set by your PHA’s administrative plan.

NSPIRE changes the list a little

HUD is moving voucher programs from HQS to NSPIRE. Most of the items above still matter, but NSPIRE scores deficiencies by severity and adds items such as GFCI and CO expectations. See HQS vs NSPIRE and NSPIRE readiness.

Want a second set of eyes first?

A Section 8 pre-inspection from ATK walks the unit against the HQS/NSPIRE items above and gives you a plain fix list before the official inspection. Also see the printable Dayton landlord prep checklist.

ATK Inspections is an independent inspector. We are not a housing authority, not HUD, and not affiliated with GDPM or any PHA. The official HQS/NSPIRE result always comes from your program's own inspection.