A. Cover and assignment

FieldFictional sample entry
Prepared forSample Landlord LLC (fictional)
Primary unit100 Example St, Unit 2B, Sampletown, OH 00000 (fictional)
TenantRedacted — fictional placeholder, not an actual resident
Census tractN/A — fictional address
Year built1990 — fictional
Date of Request2026-03-05 — fictional
Date of Inspection2026-03-12 — fictional
Date of Last InspectionN/A — Initial
PHA
InspectorShaun Atkinson / ATK Inspections
Programs illustrated(1) HQS Initial under a hypothetical agency contract; (2) independent NSPIRE readiness review of the SAME Unit 2B

The two primary-unit sections demonstrate different reporting frameworks, not two official determinations or an automatic conversion of an HQS result into an NSPIRE score. A separate Maple Court PH/MF annex illustrates scored-property concepts and is not this voucher unit or an actual property inspection.

B. HQS Initial — agency-contract sample

Summary Decision = Fail. Three failed items are illustrated below. All remaining checklist items/categories are assumed Pass / Yes solely for this fictional sample. No inconclusive items are illustrated. An actual field inspection must record every applicable item; unobserved conditions cannot be presumed to pass.

Checklist categorySample ratingShort HQS-style comment
Living roomPass / YesAll remaining items satisfactory in this fictional scenario.
KitchenFail — electrical item onlyKitchen counter GFCI does not reset or supply power. Have qualified personnel correct and verify operation. Other kitchen items Pass / Yes.
BathroomPass / YesAll items satisfactory in this fictional scenario.
All other rooms used for livingFail — bedroom smoke alarm onlyBedroom smoke alarm missing. Install compliant alarm and verify operation. All other room items Pass / Yes.
Secondary rooms not used for livingPass / YesAll items satisfactory in this fictional scenario.
Heating and plumbingFail — water heater safety item onlyWater heater temperature-pressure relief (TPR) valve discharge piping missing. Have qualified personnel install compliant discharge piping. Other heating/plumbing items Pass / Yes.
Building exteriorPass / YesAll items satisfactory in this fictional scenario.
General health and safetyPass / YesAll remaining items satisfactory; the three exceptions above are not duplicated as additional failures.

Administrative checks: Utilities on? Yes. Access available? Yes. Other checklist questions? Pass / Yes in this fictional scenario. Follow-up required? Yes, for the three cited failures. PHA remains intentionally blank.

Form HUD-52580 / 52580-A is completed when required by the agency's HQS assignment. This is an illustrative summary, not a completed HUD form or a substitute for required paperwork. Confirm the agency's accepted form and edition. Initial fail → repair → agency-directed re-inspection is an HQS workflow; it is not a promise of an NSPIRE outcome.

C. NSPIRE readiness review — SAME fictional Unit 2B

Independent readiness review only — not the official PHA/HUD inspection. No score promised or issued. Findings are organized by inspectable area and severity. Severity must be verified against the current HUD standard, exact condition and applicable PHA requirements; an HQS failure does not mechanically establish an NSPIRE severity.

IDAreaFictional findingIllustrative NSPIRE severityReadiness action
U-01UnitBedroom smoke alarm missingLife-Threatening (LT)Address immediately; verify compliant installation and operation.
U-02UnitKitchen counter GFCI inoperable; no reset/powerSevereQualified electrical evaluation and correction; verify protection.
U-03UnitWater heater TPR discharge piping missingModerateQualified plumbing correction; document installation.
I-01InsideAssociated common corridor and systems serving Unit 2B reviewedNo deficiency illustratedNo severity assigned to a non-deficiency.
O-01OutsideAssociated egress route and exterior serving Unit 2B reviewedNo deficiency illustratedNo severity assigned to a non-deficiency.

Severity key: Life-Threatening / Severe / Moderate / Low. A Low finding is not invented just to fill a category. See the separate Maple Court annex for an illustrative Low finding.

Separate voucher strip — HCV / PBV / Mod Rehab

  • Outcome model: Notice PIH 2026-18 says voucher inspections “are not numerically scored, and NSPIRE retains pass/fail indicators.” The scoring/ranking process in 24 CFR 5.711(a) does not apply to HCV, PBV or Mod Rehab. Low deficiencies are informational and still pass for voucher purposes; do not market NSPIRE as one simple pass/fail product.
  • Repair clocks: Under the voucher framework / 24 CFR 982.404, Life-Threatening conditions require correction within 24 hours after owner notification; Severe and Moderate generally within 30 calendar days, or a PHA-approved extension consistent with policy. Follow the program/PHA notice. This fictional readiness visit does not issue an official deadline or restart an existing clock. Do not wait for an official inspection to address hazards.
  • Transition: National voucher NSPIRE compliance date is February 1, 2027 (90 FR 46911; PIH 2026-18). A PHA may adopt earlier; read its notice and Administrative Plan.
  • PHA LT additions: A PHA may ask HUD to add Life-Threatening conditions. HUD-approved additions must be identified in the PHA Administrative Plan; the PHA cannot remove HUD's LT items.
  • Dispute path: Owners use the PHA Administrative Plan / HAP process, not a 5.711 technical review. Participant-family informal review/hearing rules are in 24 CFR 982.554 / 982.555. A hearing is not required for a unit noncompliance finding, except the family-caused HQS breach termination exception. This is not an owner appeal route.

D. Photo log — captions only

No actual photographs or resident information are included.

1. Photo 1 placeholder: Unit 2B bedroom — location of missing smoke alarm (U-01). 2. Photo 2 placeholder: Unit 2B kitchen counter — GFCI that would not reset (U-02). 3. Photo 3 placeholder: Unit 2B utility closet — water heater TPR valve without discharge piping (U-03).

E. Separate scored-property annex — Maple Court PH/MF example

SAMPLE / FICTIONAL / NOT AN OFFICIAL HUD OR PHA REPORT. Adapted from the NSPIRE agent contribution reproduced in NSPIRE-blocks-for-HQS.md.

Property: Maple Court Apartments (fictional), 100 Sample Lane, Dayton, OH 00000 (fictional). Building A, Units 101–104. Prepared for Sample Landlord LLC (fictional). Review date: 2026-03-12 (fictional). Program context: HUD multifamily, REAC-scored NSPIRE, not HCV/PBV. The PH/MF concepts below must not be applied as a score to Unit 2B.

An independent readiness write-up uses severity, inspectable area and scoring concepts from HUD's Scoring Notice. Public housing and HUD multifamily official NSPIRE inspections are scored 0–100. This annex is not a REAC inspection, not a score and not a guarantee.

IDAreaLocation (fictional)Observed conditionSeverity from contributed illustrationIllustrative Scoring Notice Table 1 weightPH/MF repair clock under 5.711(c)
S-01UnitApt 102 — bedroom smoke alarmNo working smoke alarm in sleeping roomLife-ThreateningUnit LT — highest unit weight class; no numeric weight asserted here24 hours unless HUD variation
S-02UnitApt 101 — kitchen GFCIDead counter receptacle; no resetSevereUnit Severe 14.824 hours unless standard says otherwise or HUD variation
S-03UnitApt 103 — bath exhaustExhaust system does not respond to the control switch (no airflow when activated); no openable window or alternate dehumidification noted in this fictional sampleModerateUnit Moderate 5.530 days (Ventilation standard; PH/MF 5.711(c) Moderate)
S-04InsideBuilding A — common laundryElevated moisture level on interior surface (fictional meter reading above ambient; no mold-like substance cited on this row)LowInside Low 2.260 days (Mold-like Substance Def 4 — Inside = Low)
S-05OutsideBuilding A — north stairHandrail has movement at anchors when tested (not secure)ModerateOutside Moderate 4.530 days (Handrail Def 2 — Outside = Moderate)

NSPIRE re-check 2026-11-05: S-03–S-05 rewritten to match published HUD standards (Ventilation V3.0 8/11/23; Mold-like Substance V3.0 8/11/23; Handrail V2.2). Prior S-04 “missing cover / exposed lamp” as Low was inaccurate (Lighting – Interior deficiencies are Moderate; exposed conductors can be Life-Threatening under Electrical – Conductor). Prior S-05 “Guardrail loose” as Moderate was wrong — Guardrail Def 2 (“not securely attached…”) is Life-Threatening (24 hours). The sample now uses Handrail for the Outside Moderate teaching row. Do not label an insecure guardrail as Moderate. Moisture staining is not auto-bundled into the ventilation row; mold-like substance size bands can raise Unit severity independently. Illustration only — not a finding on any real property.

Scoring exception: Smoke-alarm defects are Life-Threatening and require prompt correction, but the Scoring Notice treats them as non-scored defects with a score annotation. The Unit LT weight class shown for S-01 is a severity reference, not a smoke-alarm deduction. Check current scoring exceptions before using any Table 1 weight.

Illustrative Table 1 weights, not calculated deductions: Unit Severe 14.8, Unit Moderate 5.5, Inside Low 2.2, Outside Moderate 4.5. HUD's method weights severity × area and normalizes deductions by units inspected. Teaching concept: 100 − (total deductions ÷ units inspected), floored at zero. No property score is computed here. ATK does not issue HUD scores.

A score below 60 fails on scored properties. A separate Unit Threshold may also force a failing score. HUD’s notice states “30 points or more” in §II.E, but Example 2 and Table 8 say “over 30.” If a result lands at exactly 30, confirm with HUD or an attorney; do not resolve that boundary in marketing. Proposed scoring changes are not in effect unless HUD publishes a final notice.

For PH/MF, LT and Severe findings generally require correction within 24 hours, with the stated exceptions; Moderate generally 30 days and Low 60 days. LT/Severe correction certification and evidence are generally due within two business days after the correction deadline. Follow the actual standard, HUD notice and official report.

A PH/MF technical review request must be received electronically by the 45th calendar day after the official inspection report is provided (24 CFR 5.711(d)). An ATK readiness report does not trigger or extend this official-report window. Assemble contemporaneous photos, measurements, and objective expert material; merely fixing a deficiency after inspection is not a basis for technical review. ATK does not file as a party's representative or promise a score change.

F. Next steps and closing

1. Address immediate hazards promptly with qualified personnel. Read the actual agency notice and applicable standard before assigning official deadlines. 2. Track each correction, responsible party, completion date and supporting evidence; do not enter personal resident data in a public inquiry form. 3. For agency-contract HQS, submit the required forms and request re-inspection under the agency's workflow. For private readiness work, arrange the official visit through HUD/PHA or the assigned provider. 4. Keep voucher Administrative Plan/HAP questions separate from the PH/MF technical review path. For legal rights or disputes, consult counsel.

Not legal advice. ATK does not represent parties before HUD or a PHA. No outcome guaranteed; HUD or the PHA makes the final determination. ATK is not HUD, REAC or a PHA. This sample and readiness review do not replace an official inspection.

Inspector: Shaun Atkinson / ATK Inspections. Ohio Home Inspector License OHI.2019006734 is a state license only, not HUD/NSPIRE authority.

ATK Inspections and ATK Enterprises are trade names of Shaun Atkinson.

HQS inspections, NSPIRE readiness reviews and consulting for agencies and landlords. On-site. Pass/fail applies where an agency contracts ATK for HQS inspections.

Email/form only: [email protected].

Request a quote · FAQ · [email protected] · (937) 553-0388

Request a quote